WHITE AVE over THOMPSON CRK

0.8MI N/O I-10 FWY · County 037, California · Built 1958 · 6 Lanes · 17,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
53C0946
Year Built
1958
Length
8.5 m (27.9 ft)
Max Span
7.9 m
Width
39.5 m (129.6 ft)
Lanes
6
Daily Traffic
17,000
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.