VERMONT AVE over DOMINGUEZ CHANNEL
1/4 MI S/O ARTESIA BLVD · County 037, California · Built 1958 · 4 Lanes · 38,000 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
33.871103, -118.290789
This bridge is in worse condition than 64.9% of bridges in County 037. The average bridge in California is 0 years old; this one is 68 years old.
Nearby Bridges
STATE ROUTE 91 over DOMINGUEZ CHANNEL
Built 1955
182ND STREET over DOMINGUEZ CHANNEL
Built 1964
PARK & RIDE ACCESS over DOMINGUEZ CHANNEL
Built 1994
NB&SB 110 HOV VIAD over I 110 SR 91 & CONNECTORS
Built 1995
ROUTE 110 over 182ND STREET
Built 1960
E&W91-S110 CONN over ROUTES 110 & 91 CONS STS
Built 1985
S110-E91 CONNECTOR over SR 91 EB
Built 1985
I 110 over SR 91
Built 1960
E91-N110 CONNECTOR over SR 91 N110-W91 CONN
Built 1985
N110-E91 CONNECTOR over ACCESS RD
Built 1985
Bridge Details
- Structure #
- 53C0664
- Year Built
- 1958
- Length
- 23.8 m (78.1 ft)
- Max Span
- 7.7 m
- Width
- 28 m (91.9 ft)
- Lanes
- 4
- Daily Traffic
- 38,000
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.