ALAMEDA ST over DOMINGUEZ CHAN

0.8MI S/O I-405 FWY · County 037, California · Built 1959 · 4 Lanes · 30,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
53C0641
Year Built
1959
Length
61.4 m (201.4 ft)
Max Span
19.8 m
Width
26.4 m (86.6 ft)
Lanes
4
Daily Traffic
30,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.