MALIBU CYN RD over MALIBU CRK

4.0MI S/O US-101 FWY · County 037, California · Built 1953 · 2 Lanes · 20,753 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53C0620
Year Built
1953
Length
66.1 m (216.9 ft)
Max Span
26.2 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
20,753
Material
Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,278,000
Total Project Cost
$2,148,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.