PUENTE AVE over WALNUT CRK

0.3MI S/O I-10 FWY · County 037, California · Built 1961 · 4 Lanes · 23,730 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
53C0336
Year Built
1961
Length
16.5 m (54.1 ft)
Max Span
15.2 m
Width
22.6 m (74.1 ft)
Lanes
4
Daily Traffic
23,730
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$372,000
Total Project Cost
$1,390,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.