2ND ST (WB) over SAN GABRIEL RIV

0.8MI E/O SR-1 HWY · County 037, California · Built 1964 · 2 Lanes · 20,882 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
53C0283L
Year Built
1964
Length
110 m (360.9 ft)
Max Span
21.9 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
20,882
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.