GAGE AVE over LOS ANGELES RIV

0.1MI W/O I-710 FWY · County 037, California · Built 1940 · 4 Lanes · 27,454 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53C0159
Year Built
1940
Length
145.1 m (476 ft)
Max Span
30.5 m
Width
17 m (55.8 ft)
Lanes
4
Daily Traffic
27,454
Material
Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$5,674,000
Total Project Cost
$6,167,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.