4TH ST over SEARS ACCESS TUNNEL

0.1MI N/O I-10 FWY · County 037, California · Built 1965 · 4 Lanes · 17,040 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53C0109
Year Built
1965
Length
10.9 m (35.8 ft)
Max Span
9.4 m
Width
22.9 m (75.1 ft)
Lanes
4
Daily Traffic
17,040
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.