ALONDRA BLVD over SAN GABRIEL RIV

0.3MI W/O I-605 FWY · County 037, California · Built 1952 · 6 Lanes · 27,192 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53C0083
Year Built
1952
Reconstructed
1972
Length
96.9 m (317.9 ft)
Max Span
21.3 m
Width
26.2 m (86 ft)
Lanes
6
Daily Traffic
27,192
Material
Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.