VALLEY BLVD over SAN GABRIEL RIV
0.1MI W/O I-605 FWY · County 037, California · Built 1916 · 4 Lanes · 60,420 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
34.055997, -118.006814
This bridge is in worse condition than 97.4% of bridges in County 037. The average bridge in California is 0 years old; this one is 110 years old.
Nearby Bridges
CLOVERLEAF DR over WALNUT CRK WASH
Built 1985
INTERSTATE 605 over RIVERGRADE OH VALLEY
Built 1964
INTERSTATE 605 over WALNUT CREEK
Built 1957
INTERSTATE 10 over W10-GARVEY AVE OFF-RAMP
Built 1956
INTERSTATE 10 EB over SAN GABRIEL RIVER
Built 1956
INTERSTATE 10 WB over SAN GABRIEL RIVER
Built 1933
INTERSTATE 10 over DURFEE RD
Built 1956
INTERSTATE 605 over S605-E10
Built 1971
N605-W10 over INTERSTATE 10
Built 2013
N605-W10 over S605-E10
Built 1964
Bridge Details
- Structure #
- 53C0032
- Year Built
- 1916
- Reconstructed
- 1950
- Length
- 287.4 m (942.9 ft)
- Max Span
- 25 m
- Width
- 21.3 m (69.9 ft)
- Lanes
- 4
- Daily Traffic
- 60,420
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,122,000
- Total Project Cost
- $10,284,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.