VALLEY BLVD over SAN GABRIEL RIV

0.1MI W/O I-605 FWY · County 037, California · Built 1916 · 4 Lanes · 60,420 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
53C0032
Year Built
1916
Reconstructed
1950
Length
287.4 m (942.9 ft)
Max Span
25 m
Width
21.3 m (69.9 ft)
Lanes
4
Daily Traffic
60,420
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$6,122,000
Total Project Cost
$10,284,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.