LOS HILLS RD over ROUTE 101

07-LA-101-31.91 · County 037, California · Built 2018 · 5 Lanes · 7,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 3086
Year Built
2018
Length
69 m (226.4 ft)
Max Span
27.6 m
Width
24 m (78.7 ft)
Lanes
5
Daily Traffic
7,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.