ROUTE 5 over COYOTE CREEK

07-LA-005-0.34-LMRD · County 037, California · Built 2022 · 12 Lanes · 169,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
53 3044
Year Built
2022
Length
43.3 m (142.1 ft)
Max Span
12.2 m
Width
62.4 m (204.7 ft)
Lanes
12
Daily Traffic
169,000
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.