INTERSTATE 5 over MAGIC MOUNTAIN PARKWAY

07-LA-005-R53.33-SCTA · County 037, California · Built 2005 · 8 Lanes · 148,959 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 2928
Year Built
2005
Length
94 m (308.4 ft)
Max Span
29 m
Width
47.2 m (154.9 ft)
Lanes
8
Daily Traffic
148,959
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.