W105-IMPERIAL OFFR over ROUTE 105 & LRT

07-LA-105-R1.79-LA · County 037, California · Built 1990 · 3 Lanes · 16,949 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 2807K
Year Built
1990
Length
263.7 m (865.2 ft)
Max Span
48.8 m
Width
14.5 m (47.6 ft)
Lanes
3
Daily Traffic
16,949
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.