2 RGHT LANES I-110 over ROADWAY FILL & PARKING

07-LA-110-19.52-LA · County 037, California · Built 1996 · 2 Lanes · 159,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
53 2778R
Year Built
1996
Length
102.4 m (336 ft)
Max Span
7.3 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
159,500
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.