W105-VERMONT OFFRP over S110-W105 CONNECTOR RAMP

07-LA-105-R6.83-LA · County 037, California · Built 1993 · 2 Lanes · 8,466 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 2675K
Year Built
1993
Length
153.5 m (503.6 ft)
Max Span
61 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
8,466
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.