STATE ROUTE 60 over JOYCE DRAIN

07-LA-060-20.06 · County 037, California · Built 1967 · 8 Lanes · 204,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
53 2460
Year Built
1967
Length
10.4 m (34.1 ft)
Max Span
3.7 m
Width
49.9 m (163.7 ft)
Lanes
8
Daily Traffic
204,000
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.