ROUTE 105 & LRT over W105-S710 CONN

07-LA-105-R13.47-PRM · County 037, California · Built 1993 · 10 Lanes · 217,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 2419
Year Built
1993
Length
377.3 m (1237.9 ft)
Max Span
48.1 m
Width
66.4 m (217.8 ft)
Lanes
10
Daily Traffic
217,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.