INTERSTATE 5 over PARKER ROAD DRAIN

07-LA-005-R58.70 · County 037, California · Built 1968 · 8 Lanes · 74,354 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
53 2353M
Year Built
1968
Length
7.1 m (23.3 ft)
Max Span
3.6 m
Width
52 m (170.6 ft)
Lanes
8
Daily Traffic
74,354
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.