INTERSTATE 5 over WILEY CANYON CHANNEL

07-LA-005-R49.20 · County 037, California · Built 1967 · 10 Lanes · 206,377 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
53 2139M
Year Built
1967
Length
23.2 m (76.1 ft)
Max Span
7.9 m
Width
100 m (328.1 ft)
Lanes
10
Daily Traffic
206,377
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.