STATE ROUTE 91 over CHERRY AVE

07-LA-091-R13.09-LBCH · County 037, California · Built 1970 · 11 Lanes · 258,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 2123
Year Built
1970
Length
54.9 m (180.1 ft)
Max Span
27.5 m
Width
45.1 m (148 ft)
Lanes
11
Daily Traffic
258,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.