CAMPUS RD-WB10 ON over EMBANKMENT
07-LA-010-20.95-MONP · County 037, California · Built 1972 · 2 Lanes · 6,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.061328, -118.171064
This bridge is in worse condition than 15.3% of bridges in County 037. The average bridge in California is 0 years old; this one is 54 years old.
Nearby Bridges
EASTERN AVE over I 10 CONN BUS METRO RMPS
Built 1972
W10 BUSWAY over METROLINK & EB BUSWAY
Built 1974
EASTERN AV-EB10 ON over EMBANKMENT
Built 1972
W10-CAMPUS DR OFF over N&S710-W10 CONNECTOR RMP
Built 1972
E10 BUSWAY over S710-W10 CONNECTOR
Built 1974
ROUTE 710 SB over ROUTE 10 & CONNECTORS
Built 1960
ROUTE 710 SB over RAMONA BLVD
Built 1960
CAMPUS ROAD over I 10 CONN RMPS METRO BUS
Built 1972
E10 BUSWAY over INTERSTATE 710
Built 1974
ROUTE 710 NB over ROUTE 10 & CONNECTORS
Built 1960
Bridge Details
- Structure #
- 53 2055K
- Year Built
- 1972
- Length
- 77.7 m (254.9 ft)
- Max Span
- 29 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 6,500
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.