PICO CANYON LYONS over INTERSTATE 5

07-LA-005-R50.33 · County 037, California · Built 1967 · 5 Lanes · 20,288 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 1783
Year Built
1967
Reconstructed
1992
Length
97 m (318.2 ft)
Max Span
48.7 m
Width
30.5 m (100.1 ft)
Lanes
5
Daily Traffic
20,288
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.