MUREAU RD over ROUTE 101

07-LA-101-29.06 · County 037, California · Built 1965 · 2 Lanes · 5,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 1681
Year Built
1965
Length
62.2 m (204.1 ft)
Max Span
21.6 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
5,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.