INTERSTATE 405 over PARTHENIA STREET

07-LA-405-44.24-LA · County 037, California · Built 1963 · 11 Lanes · 216,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 1439
Year Built
1963
Reconstructed
1996
Length
45.4 m (149 ft)
Max Span
27.4 m
Width
46.6 m (152.9 ft)
Lanes
11
Daily Traffic
216,000
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.