ST RTE 60 EB over I-5 CONN RAMP

07-LA-060-R0.63-LA · County 037, California · Built 1965 · 5 Lanes · 108,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 1393R
Year Built
1965
Length
455.1 m (1493.1 ft)
Max Span
45.7 m
Width
20.3 m (66.6 ft)
Lanes
5
Daily Traffic
108,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.