N405-E&W105 CONN over UPRR EL SEGUNDO BL RMPS

07-LA-405-20.19-HAW · County 037, California · Built 1989 · 2 Lanes · 10,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
53 1238G
Year Built
1989
Length
477.9 m (1567.9 ft)
Max Span
54.9 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
10,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.