CHERRY AVENUE over ROUTE 405

07-LA-405-4.88-LBCH · County 037, California · Built 1964 · 4 Lanes · 19,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 1200
Year Built
1964
Length
113.7 m (373 ft)
Max Span
32.6 m
Width
31.1 m (102 ft)
Lanes
4
Daily Traffic
19,600
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.