INTERSTATE 5 over VAN NUYS BLVD

07-LA-005-38.50-LA · County 037, California · Built 1963 · 15 Lanes · 294,907 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
53 1126
Year Built
1963
Reconstructed
1976
Length
51.2 m (168 ft)
Max Span
16.2 m
Width
76.7 m (251.6 ft)
Lanes
15
Daily Traffic
294,907
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.