LOS FELIZ BLVD OC over I-5

07-LA-005-24.33-LA · County 037, California · Built 1956 · 6 Lanes · 43,801 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 1070
Year Built
1956
Length
91.6 m (300.5 ft)
Max Span
27.3 m
Width
29.8 m (97.8 ft)
Lanes
6
Daily Traffic
43,801
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.