RTE 110 over TORRANCE BLVD
07-LA-110-7.74-LA · County 037, California · Built 1962 · 10 Lanes · 218,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.842025, -118.286214
This bridge is in worse condition than 97.4% of bridges in County 037. The average bridge in California is 0 years old; this one is 64 years old.
Nearby Bridges
HAMILTON AVE over TORRANCE LATERAL
Built 1983
FIGUEROA ST over TORRANCE LATERAL
Built 1960
VERMONT/TORRANCE over TORRANCE LATERAL CHAN
Built 1961
INTERSTATE 110 over DEL AMO BLVD
Built 1962
MAIN ST over TORRANCE LATERAL BR
Built 1962
CARSON STREET over I-110
Built 1962
INTERSTATE 405 over MAIN STREET
Built 1961
NORMANDIE AVE over 212TH ST DRAIN
Built 1959
DEL AMO BLVD over DOMINGUEZ CHAN
Built 2003
DEL AMO BLVD over I 405 DOMINGUEZ CHANNEL
Built 2003
Bridge Details
- Structure #
- 53 0962
- Year Built
- 1962
- Length
- 20.4 m (66.9 ft)
- Max Span
- 19.2 m
- Width
- 47.8 m (156.8 ft)
- Lanes
- 10
- Daily Traffic
- 218,000
- Material
- Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $977,000
- Total Project Cost
- $1,641,000