U.S. HIGHWAY 101 over HOLLY DR

07-LA-101-7.38-LA · County 037, California · Built 1952 · 11 Lanes · 154,000 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 0801
Year Built
1952
Length
13.1 m (43 ft)
Max Span
11.6 m
Width
92.9 m (304.8 ft)
Lanes
11
Daily Traffic
154,000
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.