ROWAN AVE over ROUTE 60

07-LA-060-R2.22 · County 037, California · Built 1965 · 2 Lanes · 2,050 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
53 0119
Year Built
1965
Length
72.2 m (236.9 ft)
Max Span
25 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
2,050
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.