STATE ROUTE 60 over WHITTIER BLVD

07-LA-060-R1.25-LA · County 037, California · Built 1965 · 2 Lanes · 7,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
53 0075S
Year Built
1965
Reconstructed
2004
Length
82.4 m (270.3 ft)
Max Span
43.8 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
7,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.