STATE ROUTE 1 over ZUMA CREEK

07-LA-001-54.95 · County 037, California · Built 1927 · 4 Lanes · 25,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 0028
Year Built
1927
Reconstructed
1938
Length
30.2 m (99.1 ft)
Max Span
9.8 m
Width
24 m (78.7 ft)
Lanes
4
Daily Traffic
25,100
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.