LOST CANYON DRIVE over TAPO CANYON DRAIN

0.1 MI W/O TAPO CANYON RD · County 111, California · Built 2001 · 2 Lanes · 2,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
52C0290
Year Built
2001
Length
13 m (42.7 ft)
Max Span
6.2 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
2,000
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.