UPLAND RD over CALLEGUAS CREEK
0.3 MI E. LEWIS RD · County 111, California · Built 1988 · 4 Lanes · 15,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.239681, -119.007464
This bridge is in worse condition than 71.9% of bridges in County 111. The average bridge in California is 0 years old; this one is 38 years old.
Nearby Bridges
ADOLFO RD over CALLEGUAS CREEK
Built 1982
FLYNN RD. over SOMIS DRAIN
Built 1981
VIA ALONDRA over SOMIS DRAIN
Built 1982
MISSION OAKS BLVD over CALLEGUAS CREEK
Built 1997
U.S. HIGHWAY 101 over ARROYO CALLEGUAS
Built 1987
PLEASANT VALLEY RD over ROUTE 101
Built 1959
U.S. HIGHWAY 101 over UP RR AMTRAK SCRRA SR 34
Built 1953
U.S. HIGHWAY 101 over ARROYO CONEJO
Built 1987
ARNEILL ROAD over US HIGHWAY 101
Built 2005
RIDGEVIEW ST over CONEJO CREEK
Built 1991
Bridge Details
- Structure #
- 52C0266
- Year Built
- 1988
- Length
- 95.1 m (312 ft)
- Max Span
- 31.7 m
- Width
- 26.2 m (86 ft)
- Lanes
- 4
- Daily Traffic
- 15,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.