COCHRAN STREET over TAPO CANYON CREEK

0.2 MI W SEQUOIA AVE · County 111, California · Built 1965 · 5 Lanes · 26,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
52C0116
Year Built
1965
Length
9.8 m (32.2 ft)
Max Span
4.2 m
Width
24.3 m (79.7 ft)
Lanes
5
Daily Traffic
26,000
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.