HITCH BLVD over ARROYO LAS POSAS
0.3 MI S OF ST RTE 118 · County 111, California · Built 1950 · 2 Lanes · 3,100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.271756, -118.924772
This bridge is in worse condition than 25% of bridges in County 111. The average bridge in California is 0 years old; this one is 76 years old.
Nearby Bridges
STATE ROUTE 118 over MEJICO CREEK
Built 1978
GRIMES CANYON RD over GRIMES CANYON WASH
Built 1967
TIERRA REJADA RD. over ARROYO SIMI
Built 1990
GRIMES CANYON RD over GRIMES CANYON WASH
Built 1954
STATE ROUTE 118 over LONG CANYON CREEK
Built 2000
GRIMES CANYON ROAD over GRIMES CANYON WASH
Built 2008
LAS POSAS RD over ARROYO SANTA ROSA
Built 1972
SANTA ROSA RD over ARROYO SANTA ROSA
Built 1972
SPRING RD. over ARROYO LAS POSAS
Built 1999
BROADWAY RD over SHEKELL WASH
Built 1950
Bridge Details
- Structure #
- 52C0033
- Year Built
- 1950
- Reconstructed
- 1968
- Length
- 50.3 m (165 ft)
- Max Span
- 11.9 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 3,100
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.