FLORADALE AVE over SANTA YNEZ RIVER

0.8 MI N CENTRAL AVE · County 083, California · Built 2023 · 2 Lanes · 7,009 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
51C0370
Year Built
2023
Length
176.8 m (580.1 ft)
Max Span
50.3 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
7,009
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.