ALISAL ROAD over SANTA YNEZ RIVER
0.8 MI S SR 246 · County 083, California · Built 1971 · 2 Lanes · 1,712 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 4 | Poor |
Location
34.584367, -120.144825
This bridge is in worse condition than 96.2% of bridges in County 083. The average bridge in California is 0 years old; this one is 55 years old.
Nearby Bridges
STATE ROUTE 246 over ALAMO PINTADO CREEK
Built 1954
REFUGIO ROAD over SANTA YNEZ RIVER
Built 1985
ALAMO PINTADO ROAD over ALAMO PINTADO CREEK
Built 1986
US HIGHWAY 101 SB over NOJOQUI CREEK
Built 1956
US HIGHWAY 101 NB over NOJOQUI CREEK
Built 1956
US HIGHWAY 101 NB over NOJOQUI CREEK
Built 1956
US HIGHWAY 101 NB over NOJOQUI CREEK
Built 1955
US HIGHWAY 101 SB over NOJOQUI CREEK
Built 1956
US HIGHWAY 101 SB over NOJOQUI CREEK
Built 1955
US HIGHWAY 101 NB over NOJOQUI CREEK
Built 1938
Bridge Details
- Structure #
- 51C0008
- Year Built
- 1971
- Length
- 260 m (853 ft)
- Max Span
- 30.5 m
- Width
- 11.5 m (37.7 ft)
- Lanes
- 2
- Daily Traffic
- 1,712
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,990,000
- Total Project Cost
- $5,023,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.