SALVAR RD over STATE ROUTE 154

05-SB-154-R31.20 · County 083, California · Built 1972 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
51 0259
Year Built
1972
Length
75.8 m (248.7 ft)
Max Span
37.9 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.