US HIGHWAY 101 NB over UP RR & AMTRAK

05-SB-101-R0.25 · County 083, California · Built 1971 · 3 Lanes · 32,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
51 0229R
Year Built
1971
Reconstructed
1997
Length
83.8 m (274.9 ft)
Max Span
35.4 m
Width
16.2 m (53.1 ft)
Lanes
3
Daily Traffic
32,500
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.