STATE ROUTE 166 over CUYAMA RIVER

05-SB-166-R30.37 · County 083, California · Built 1974 · 2 Lanes · 2,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
51 0218
Year Built
1974
Length
83.5 m (274 ft)
Max Span
27.4 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
2,500
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.