US HIGHWAY 101 NB over SOLOMON SUMMIT UC

05-SB-101-78.69 · County 083, California · Built 1956 · 2 Lanes · 14,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
51 0191R
Year Built
1956
Reconstructed
1995
Length
9.4 m (30.8 ft)
Max Span
8.5 m
Width
15 m (49.2 ft)
Lanes
2
Daily Traffic
14,500
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.