STATE ROUTE 154 over COLD SPRING CANYON

05-SB-154-22.96 · County 083, California · Built 1963 · 2 Lanes · 13,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
51 0037
Year Built
1963
Length
371.2 m (1217.8 ft)
Max Span
213.4 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
13,500
Material
Steel
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.