ARROW STREET over CALLOWAY CANAL

S OF RTE 204 E OF RTE 99 · County 029, California · Built 2006 · 2 Lanes · 1,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
50C0359
Year Built
2006
Length
8.2 m (26.9 ft)
Max Span
4.1 m
Lanes
2
Daily Traffic
1,000
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.