COFFEE ROAD over FRIANT-KERN CANAL

0.30 MI N OF ROSEDALE HWY · County 029, California · Built 1990 · 6 Lanes · 40,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
50C0323
Year Built
1990
Length
27.1 m (88.9 ft)
Max Span
27.1 m
Width
31.1 m (102 ft)
Lanes
6
Daily Traffic
40,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.