4TH STREET over SANDY CREEK

SOUTH OF ASH STREET · County 029, California · Built 1970 · 2 Lanes · 3,560 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
50C0197
Year Built
1970
Length
9.1 m (29.9 ft)
Max Span
4.3 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
3,560
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.