RANCHO DRIVE over ARVIN-EDISON CANAL

3 MI NORTH OF DAVID RD · County 029, California · Built 1966 · 2 Lanes · 1,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
50C0102
Year Built
1966
Length
12.2 m (40 ft)
Max Span
11.3 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
1,200
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.